The Pysanka Solar Power Project is a renewable energy initiative located in the south of Ukraine, developed and owned by the Ukrainian group Kernel. The project involves the construction and operation of a solar power plant and an associated 110 kV grid connection, aiming to contribute to Ukraine’s sustainable energy production and carbon reduction commitments. To support project financing, the EBRD contracted AVG as an independent consultant to undertake a comprehensive Environmental and Social Due Diligence (ESDD) in accordance with the Bank’s 2024 Environmental and Social Policy (ESP) and relevant Environmental and Social Requirements (ESRs).
Assess Project-related E&S impacts and risks to confirm the formal Project categorization.
Describe a relevant E&S baseline commensurate with the risks posed by the Project, including physical, biological, and socio-economic factors.
Evaluate potential impacts (including cumulative and supply chain risks) and propose mitigation measures across all project lifecycle stages.
Prepare a draft E&S Assessment report covering the Bank’s requirements, including a Compliance Summary table against the EBRD ESRs.
Prepare a draft Environmental and Social Action Plan (ESAP), a Stakeholder Engagement Plan (SEP), and a Non-Technical Summary (NTS).
Determine if additional specialized studies (e.g., biodiversity, resettlement, retrenchment) are required.
Incorporate feedback from the EBRD, co-lenders, and the Client to finalize the documentation package.